As the pictures suggest, Its no easy task supporting a 240 tonne concrete on a row of concrete seacant piles, thats why Rocky Johnson was chosen for this special job!

This large scale rail car unload pit for aggregates required industrial grade formwork and also perfect precision for the anchor bolt layout and abutments. Thanks to our robotic layout navigation system we were able to install these continuous pilecaps, abutments and bridge anchor bolts with amazing accuracy so when they craned in the rail bridge, it fit to perfection.

We are thankful to Knelsen and Ruskin Construction for allowing Rocky Johnson the opportunity to work with them on this important project!